Proposed Concepts: 210
The first step in the concept development process was to create a set of preliminary concepts. These concepts seek to improve traffic safety and mobility at the Exit 210 Interchange (I-84/OR-11). Descriptions of the seven concepts are provided below and links to illustrations of the proposed concepts are shown on the right-hand side of the page.
PROPOSED CONCEPTS
- Concept 1 - Split diamond interchange at Old Dump Road
- Concept 2 - Split diamond interchange at Goad Road
- Concept 3 - Five-legged roundabout at westbound ramp terminal and south side backage road
- Concept 4 - Right-in/right-out access at Kirk Avenue
- Concept 5 - Kirk Avenue re-alignment to the north
- Concept 6 - Button-hook eastbound ramp
- Concept 7 - Roundabouts at ramp terminals
CONCEPTS ADVANCED FOR FURTHER CONSIDERATION
Your feedback in a public survey April 2020 on these concepts was used by the City and ODOT in the second step of the concept development process to select and refine two concepts: Concept 1 and Concept 5/5B.
Please continue to the Blue Room: Concept Evaluation for Exit 207 to learn about the operations, safety, and cost evaluation for these two concepts.