The first step in the concept development process was to create a set of preliminary concepts. These concepts seek to improve traffic safety and mobility at the Exit 210 Interchange (I-84/OR-11). Descriptions of the seven concepts are provided below and links to illustrations of the proposed concepts are shown on the right-hand side of the page.


PROPOSED CONCEPTS
  • Concept 1 - Split diamond interchange at Old Dump Road
  • Concept 2 - Split diamond interchange at Goad Road
  • Concept 3 - Five-legged roundabout at westbound ramp terminal and south side backage road
  • Concept 4 - Right-in/right-out access at Kirk Avenue
  • Concept 5 - Kirk Avenue re-alignment to the north
  • Concept 6 - Button-hook eastbound ramp
  • Concept 7 - Roundabouts at ramp terminals

CONCEPTS ADVANCED FOR FURTHER CONSIDERATION


Your feedback in a public survey April 2020 on these concepts was used by the City and ODOT in the second step of the concept development process to select and refine two concepts: Concept 1 and Concept 5/5B.


Please continue to the Blue Room: Concept Evaluation for Exit 207 to learn about the operations, safety, and cost evaluation for these two concepts.